Photogallery
 

Gathering Center Construction
8 January 2006
 
2006-01-08_001.jpg
Gathering Center and main entrance as seen from the north.  The link to the Chapel and the Education Center is at the left.  The present church is at the right.

2006-01-08_002.jpg
A view toward the east southeast of the gathering space.  The entrance to the parish office is on the right behind the lift.  The link to the Chapel and the Education Center is behind the lifts on the left.  Left of the link is the location for the Saint Cecilia stained glass window, which will be relocated from the old link.
2006-01-08_003.jpg
A view toward the northeast corner of the gathering space.  The main entrance is to the left, just out of view.  The northeast corner will house the new usher’s room and a fire-rated storage room for parish records.
2006-01-08_004.jpg
A view toward the southeast corner of the gathering space.  The entrance to the existing church and new restrooms will be in this corner.
2006-01-08_005.jpg
This view is from the east looking northwest.  The bright area is the main entrance, on the north side of the Gathering Center.  The new ushers' room is at the center of the picture.  The box with the red tubing at the bottom is the control panel for the underfloor heating and icemelt system at the entrance to the Gathering Center.  The room for storage of parish records is on the right, where the scaffolding is sitting. 
2006-01-08_006.jpg
This view is from the southwest corner looking north.  The bright area at the right is the main entrance to the Gathering Center.  The new vesting sacristy is straight ahead.

2006-01-08_007.jpg
This view is from the west looking to the southeast.  The entrance to the parish office is in the center, behind the lift platform.  The social hall is at the right, behind the temporary plywood wall.



| Home | Site Map | Tell us how we can improve | Top |

Last updated: 21 January 2006 wjh